Thursday, April 21, 2005


The garage floor, now full of gravel. It took 12 truck and trailer loads of gravel to fill it in. Remember, the retaining wall on the back side is 8 feet tall! To the left of the garage you can see the circular foundation wall where the entry turret will be (the floor will be just above the top of that wall. The rectangle to the left is the covered porch. If you are standing on the porch facing into the trees, the front door will be on your right. Posted by Hello

Sunday, April 17, 2005


The framing is off the walls. The next step is to pour the garage floor. Posted by Hello

Another view of the GIGANTIC retaining walls holding up the garage floor. The floor of the main level of the house will be about 4 feet down from the top of that wall. Posted by Hello

Tuesday, April 05, 2005


James checking out the work so far. You can see how tall the walls are -- he's 6' tall. Posted by Hello

Foundation update

The first foundation step is complete, and now the second one is too. Here is the foundation right before the pour of the retaining walls.